top of page
Log In
Threadworks
Operational and Maintenance Dashboard
Home
Menu
General Information
Reports & Surveys
Aftercare & Customer Services
Wayleave - Buildover Agreement
Health & Safety
Fire Information
O&M Manuals and Drawings
Testing & Commissioning
Practical Completion
Additional Information
Training & Demonstration Videos
Appliance Manuals
More
FixFlo Training Guide
Drainage CCTV & Report
File Search & Download
Contact Us
O&M Manuals and Drawings
Architectural
Architects Finishes Schedule
Cladding
Architects Final Drawings
Brickwork &
Blockwork
Roofing
Windows & Curtain Walling
Doors / Joinery / Ironmongery
SFS, Partitioning &
Dry Lining
Passive Fire
Protection
Architectural Metalwork
Bathroom Pods
Soft & Hard
Flooring
Decorating
Wall and Floor
Tiling
Landscaping
Mansafe / Abseiling
Blinds
Civil & Structural
Engineers Final Drawings
Precast Concrete Walls, Stairs & Lift Shaft, Columns Floors, Façade
Surfacing Work &
Block Paving
Engineers Final Drawings (Post Construction Civils)
Structural Steelwork
Concrete Floors
Drainage and Petrol Interceptors
Entrance Gates, Fencing, Barriers,
Cycle Shelters & Bin Stores
Sealants / Mastic
Building Services
Lifts
Mechanical Works
Electrical Works, PV Panels & Access Control
Fire Sprinklers
Kitchens
Signage
Smoke Ventilation
Fixed, Loose and Amenity FF&E
(Fixed Furniture, Fixtures & Equipment)
bottom of page